Detail:①Stadium foundation layerThe foundation is generally based on cement or asphalt, with a cast-in-place thickness of 100-200 millimeters. After pouring, the curing period is about 28 days, and the water content of the foundation does not exce……
①Stadium foundation layer
The foundation is generally based on cement or asphalt, with a cast-in-place thickness of 100-200 millimeters. After pouring, the curing period is about 28 days, and the water content of the foundation does not exceed 8% before the surface layer can be constructed.
The thickness of the asphalt foundation is generally 100mm. After being pressed, the curing period is sufficient for a week before the construction of the surface layer. Before the construction of the surface layer, the cement foundation must be polished on the entire site, cleaned with clean water, and dried in the sun before the primer can be applied. Asphalt foundation must have no moisture or soil on the surface before construction can be carried out.
②Sealing primer layer
Cement foundation, using a two component AB penetration primer, A main agent of 2.5 kilograms, B with 4 kilograms, mixed and stirred, and then mixed with 8-10 times water to evenly mix and roll coating throughout the site. If a single component primer is used, 20 kilograms are divided into one group, and 6 times the amount of water is directly added to stir evenly before rolling coating throughout the entire field.
Asphalt foundation does not require primer and can be directly scraped and coated in mortar.
③Mortar coating
Intermediate coating (dark gray): 1kg of intermediate coating, 1kg of sand, 1kg of water, and 0.3kg of cement. After mixing, use a large scraper to evenly scrape and level the surface. After the entire site is scraped, wait for the intermediate coating to completely dry before proceeding to the next layer of construction.
④Acrylic elastic layer
Elastic layer (light green): 1 kg of elastic layer, 0.4 kg of cement, and 0.2 kg of water. After mixing evenly, use a large scraper or toothed knife to evenly scrape and level each layer. Each layer should not exceed 2 millimeters, and the next layer can only be constructed after the entire site is completely dry.
⑤Acrylic reinforcement layer
Before scraping the reinforcement layer (light green), the entire elastic layer that has been scraped and coated must be polished flat on the site before construction. The reinforcement layer is mixed with 1 kg+0.4 kg of cement+03 kg of sand for the elastic layer, mixed evenly, and then scraped flat with a large rubber rake. Only after the entire site is dry can the next layer of construction be carried out.
⑥Top coat mortar layer
The color of the topcoat is based on the customer's selection. The topcoat is 1kg, sand is 0.5kg, and water is 0.3kg. After mixing evenly, use a large rubber rake to evenly scrape it flat. Only after the entire site is dry can the next layer of process be constructed.
⑦Topcoat texture layer
The texture layer of the topcoat is mixed with 1 kilogram of topcoat and 0.2 kilograms of water. After stirring evenly, use a large rubber rake to evenly scrape and apply, and use a long hair roller to roll and level it. Only after the entire site is dry can the next layer of process be constructed.
⑧Course drawing layer
The line drawing on the court is usually done with white paint. First, use customized textured paper to paste the entire court according to the size of the line drawing on the court. The line drawing paint is a single component that can be mixed evenly and then directly applied. If the line drawing paint is thick, add some water appropriately.